We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Land subsidence correction work.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Land subsidence correction work - List of Manufacturers, Suppliers, Companies and Products

Land subsidence correction work Product List

1~2 item / All 2 items

Displayed results

Teratec Construction Report: School

Solving problems at school! Introducing "TerraTech" construction examples for settlement correction and void filling.

We would like to introduce a case where we solved problems caused by subsidence and voids at a school using the Teratec method. 【Problem】 We received a consultation from a junior high school in Yamagata Prefecture stating, "The classroom floor is sagging, and the desks are wobbling." Upon investigation, it was confirmed that voids were present under the floors in six classrooms due to long-term ground subsidence. 【Reason for Choosing Teratec】 It was believed that the methods to address ground subsidence of concrete floors were either to redo the flooring or to apply a topping and adjust the level. However, considering the time required for moving, demolition work, and the curing period after concrete pouring, it was determined that the construction would take more than a month, making it difficult to complete during the summer vacation. Therefore, the Teratec method was adopted. 【Feedback After Construction】 By utilizing the summer vacation period to implement this method, we were able to completely eliminate the wobbling of desks and chairs. *For more details, please visit the external link page or feel free to contact us. https://teretek.jp/plus/case/school Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Void Filling Work for a Warehouse Handling Medical Equipment (Gifu Prefecture)

It is possible to correct subsidence in a short period without damaging the floor! Here are examples of corrections made without moving the cargo.

We would like to introduce a case where "void filling work" was carried out at a logistics warehouse handling medical supplies located in Gifu Prefecture. Due to ground subsidence, voids had formed under the floor, which were filled with polyurethane resin. Compared to traditional concrete replacement methods, this construction generates almost no dust or debris, allowing for work to be done without moving the cargo. 【Case Overview】 ■ Area: Gifu Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration